Facilities

Tier III Power System

Electricity Source

  • Main: Khlong Chan, Substation, Underground
  • Back up: Phattanakan, Substation, Underground
  • 2 Routes Main Electricity
  • Electric System N+1
  • Total Capacity 12 MVA
  • Transformer 2,500 KVA x 6 Units
  • Generator 2,500 KVA x 6 Units
  • UPS 1,200 KVA x 6 Units
  • 5 MW IT Load
  • PUE 1.32 Designed

Chilled Water Cooling System

  • Cooled water chiller with configuration N+1
  • Fan wall system for data center, powerful cooling
  • Intelligent control
  • Hot aisle containment
  • Temperature 18-24c
  • Humidity 45-60%

DETECTION & PREVENTION SYSTEM

  • Leak detection system
  • Aspirated smoke detection VESDA® complete site coverage
  • Pre action fire suppression system